Wind Tunnel Tests Compliant with AMCA Standards

There are wind tunnels of different diameters in the AMCA 210 standard to perform testing and verification activities.

Project Phases

Conceptual Design

Literature research, preliminary design and analysis activities are carried out during this phase.

Detailed Design

Finalizing the design, completing the detailed analysis, completing the model and preparing the production drawings are carried out during this phase.

Production Phases

Production planning and purchasing activities are carried out through this phase.

Verification Activities and Tests

In this phase, tests are carried out to meet technical demands.

Verification Activities and Tests

In this phase, tests are carried out to meet technical demands.

Qualified Product

The production of the qualified product, whose verifications are completed and meets the technical requirements, is completed.

Thank you for choosing us.

Milpower Defense Systems Inc. With its expert staff, it offers cooling systems for your needs with domestic national opportunities.

Aerodynamics and Structural

Engineering Solutions

Production, Assembly and Testing

Ability

Expert Personnel

Domestic National Product